On July 16, 2020, Taiwan Semiconductor Manufacturing Company announced that it expected to spend US$16 billion to US$17 billion on capital expenditures in 2020. Its earlier range was US$15 billion to US$16 billion. CFO Wendell Huang told analysts that the increase was primarily for advanced technologies. Management pointed to demand from customers developing products for 5G and high-performance computing, including applications that use considerable processing power. Taipei Times independently covered the announcement and the rationale given on the earnings call. [1][2][3]

TSMC made the decision as a manufacturer of chips designed by other companies. It had to judge whether enough customers would need capacity on its advanced manufacturing processes over the time required to equip and ramp a production line. The same earnings call discussed uncertainty related to the pandemic and questions about available capacity after restrictions affecting shipments to Huawei. The increase was a forecast and investment decision made in that setting. [2][3]

The second-quarter results already showed higher earnings. Net revenue was NT$310.70 billion, up 28.9% from the same quarter in 2019. Net income was NT$120.82 billion, up 81%. These results cover the quarter that ended before the July budget announcement. The July increase could shape capacity coming online later and cannot account for the quarter’s reported results. [1][3]

TSMC’s January 2021 management report put actual consolidated capital expenditure for 2020 at US$17.24 billion. It reported annual net revenue of NT$1,339.26 billion, up 25.2% from 2019. The 5-nanometer process represented 8% of wafer revenue in the third quarter and 20% in the fourth. Those shares describe sales mix, not the portion of factory capacity installed or the utilization of individual lines. The report does not attribute annual earnings to the incremental capital decision. [4]

The timing of capacity matters because customers must design and qualify chips for a manufacturing process. A foundry needs equipment and trained staff before it can supply meaningful volume. Starting too late can leave capacity unavailable when a customer is ready. Starting too early can leave equipment underused and make each wafer more expensive to produce. TSMC’s management distinguished the economics of a new process ramp from the company-wide demand outlook. On the July call, it expected the initial 5-nanometer ramp to dilute margins in the following quarters. That was a forecast. [2]

Demand across several product areas can support more equipment than demand from a single program. It still matters which products can use the same process and when they are qualified to run. The case illustrates how broad themes such as 5G and high-performance computing can inform a capacity decision when they are linked to customer requirements. The published materials do not reveal customer orders, contractual commitments, or yields at particular factories. [2][3][4]

Analysis & application

For a capacity decision, make a demand table by customer program, required process, expected qualification date and plausible volume. Distinguish designs undergoing evaluation, qualified programs and orders with delivery dates. Translate each into time on the equipment that constrains output. Set thresholds for ordering equipment, installing it and adding shifts. Revisit those decisions when commitments, yields or operating conditions change.

Track yield, line utilization, customer concentration and delivery reliability through the ramp. Use a conservative estimate of how easily capacity can switch between customers. Compare actual investment with the announced range and separate the year’s results from later returns. This is especially important when the spend is large, timing is uncertain and the assets may remain in use for several years.

In January 2021, TSMC reported the realized annual spending and the quarter-by-quarter capital expenditure figures. It also published manufacturing-process revenue shares and operating margins. Those disclosures let readers compare the July plan with total spending and observe the growing commercial contribution of 5-nanometer products. Evaluating the payback of the extra equipment would additionally require later utilization, pricing, operating costs and a credible baseline for what would have happened without the July increase. [4]

FOLLOW THE EVIDENCE

The sources

  1. TSMC Reports Second Quarter EPS of NT$4.66 TSMC, filed with the U.S. Securities and Exchange Commission · sec.gov ·
  2. TSMC Q2 2020 Earnings Call, corrected transcript TSMC investor relations · investor.tsmc.com ·
  3. TSMC raises capex to US$17bn Lisa Wang, Taipei Times · taipeitimes.com ·
  4. TSMC 4Q20 Management Report TSMC investor relations · investor.tsmc.com ·