In 2004, Con Edison began a program of preventive inspections on its low-voltage underground network. The inspections generated a list of work that could not all be performed at once. A research collaboration with Columbia University used past events and infrastructure data to rank manholes and service boxes in Manhattan by vulnerability. That gave the maintenance team a way to decide which locations to examine first. [1][2][3]
The historical records had been collected for other purposes. Dispatch reports included free-text descriptions of incidents, locations and field work alongside details unrelated to equipment condition. The researchers linked those reports with network and asset information. Their task was to distinguish records of serious events and connect them to the correct structure before building a ranking that crews could use. [1][2][3]
The 2010 paper reports that the resulting rankings helped Con Edison prioritize work on the Manhattan grid. Science News also described a blind test in which Con Edison withheld details of a recent set of fires and explosions. The top 2% of structures in the ranking included 11% of those that had recently experienced one of the selected events, according to the report. Those figures describe concentration in a withheld set. They do not measure the share of events prevented by repairs. [2][3]
The 2014 project paper described the wider reliability work and reported on the low-voltage ranking alongside other modeling work. The scope matters: a ranking of particular underground structures for preventive maintenance does not forecast all electricity outages or prove that a given structure will fail on a particular date. [1][2]
The ranking was a better fit for the decision than an exact failure forecast. Crews needed an order in which to review locations, while the events of interest were infrequent relative to the number of structures. The team used characteristics of the cables and records of past trouble to identify locations with more vulnerability over time. Giving priority to a group of higher-ranked locations could be useful even if the exact next incident remained unpredictable. [1][2][3]
Linking events to assets was part of the engineering work. An incident mentioned in a dispatch log might be near several structures or might describe symptoms without identifying the affected equipment. Treating every nearby structure as the source would give the model misleading examples. The published work describes preparing event and asset data before comparing predictions with later observations. [1][2]
Analysis & application
For a similar maintenance project, begin with the question the crews can act on. Define the units they inspect, the types of failures that matter and the number of jobs they can complete. Use a historical cutoff to build the ranking and test against later records withheld from the model. Compare the share of relevant events captured in the first group of locations with a simpler ordering, such as age alone. [1][2]
Track the reason for each field visit, what it finds and whether a repair follows. Changing inspection frequency can change the records available to the model. Compare similarly monitored areas when judging whether failures declined. That helps distinguish a useful ranking from the effect of the resulting maintenance, and it makes it possible to identify locations that appear safer merely because they were inspected less. Agree with the field team on how to handle an asset with uncertain identity. Keep that uncertainty visible and check whether resolving it would change the order of inspections before committing crews.
The Manhattan findings led the researchers to explore work in other boroughs, and the 2014 paper documented the broader effort with Con Edison. An extension has to account for local differences in the way assets are recorded, connected and maintained. The demonstrated contribution was a way to order preventive work using data the utility already collected. Measuring avoided failures or applying the method to another network requires a separate validation. [1][2][3]
FOLLOW THE EVIDENCE
The sources
- Analytics for Power Grid Distribution Reliability in New York City Interfaces, Rudin et al., via Columbia University · cs.columbia.edu ·
- A process for predicting manhole events in Manhattan Machine Learning, Rudin et al., via MIT · web.mit.edu ·
- Machine versus manhole Science News · sciencenews.org ·