At London Gateway, DP World announced a project for empty shipping containers in October 2025. Instead of placing the containers directly on one another, the proposed system would store them in racks. Automated equipment would retrieve a container from its assigned position. The design called for a fully enclosed building, racks up to sixteen tiers high and accommodation for twenty- and forty-foot empty containers. The project was intended to free space within a busy terminal and simplify access to the empty containers. [1][3][4]

The planning material places the building in the existing empty container yard, with transfer points for trucks and equipment used within the terminal. The operator announced a larger investment in container-handling technology, while a separate public notice covered engineering consultancy for this facility. The notice’s work included foundations, civil and electrical infrastructure, fire systems and support during construction. [1][2][3][4] The applicant’s drawings described ten aisles and a footprint of approximately 50,000 square metres. The planning report also separated building construction from the connections needed to bring containers to and from it. These figures describe the submitted design. [3][4]

The October announcement and procurement notice establish the project decision and a contracted package of engineering work. The operator described capacity of up to 27,000 twenty-foot-equivalent units for the planned system. That is a design capacity. It does not show how many empty containers were stored or retrieved during a working shift. [1][2][4]

The council’s planning materials independently establish that the proposal included the automated storage building and connections to the rest of the terminal. They also show why it was a site project and not just a purchase of stacking equipment. The records reviewed for this case do not establish measured throughput, realized savings or an in-service date. [2][3][4]

The design’s operational logic is that each container can be accessed without first lifting an unrelated box out of the way. In a conventional ground stack, the order of arrival can affect which box is easy to retrieve. A rack could trade a more complex building and automation system for more predictable access to specific containers. The design also makes greater use of height on the site. [1][3][4]

The advantage depends on transfers as well as storage. If trucks or shuttle carriers wait at the handover point, reducing moves inside the rack may simply move the delay. Equipment availability, fire protection and the ability to keep serving the port during construction are therefore part of the same operational problem. The planning and procurement records describe those dependencies separately from the storage mechanism. [2][3][4]

Analysis & application

Before selecting a storage system, collect data on how many containers must be moved to retrieve a requested unit and where queues form at peak times. Compare the proposed design with the same incoming mix and number of transfer points. Record land use, energy, availability and handling time as separate measures. Include a simulated crane outage so the terminal can see whether it can still retrieve priority units. [1][2][4]

Stage the installation around the capacity the terminal needs to keep available during construction. Once the facility starts operating, test several demand levels and compare transfer time from the vessel or gate to the point where the requested box is ready. A high nominal storage count is valuable only if the port can still move enough containers through the interfaces that feed it.

The planning assessment was part of the process of moving the design toward construction. London Gateway’s case is useful because it shows a particular response to constrained land and retrieval work. Future evaluation requires operating data from this terminal, with the racks, transfer lanes and fallback procedures working together. Until that evidence is available, the stated benefits remain project expectations. [1][2][3][4]

FOLLOW THE EVIDENCE

The sources

  1. DP World introduces groundbreaking container handling technology at London Gateway DP World · dpworld.com ·
  2. Engineering Consultancy Services for Design & Construction of the BOXBAY Empty Superstack London Gateway Port Limited, via UK Find a Tender · find-tender.service.gov.uk ·
  3. Planning Committee Report, 25/01195/FUL: Container Storage Yard Thurrock Council · thurrock.moderngov.co.uk ·
  4. London Gateway BOXBAY Environmental Impact Assessment London Gateway Port Limited, planning submission · docs.planning.org.uk ·